The use of ultimate strength methods can also be used to demonstrate robustness required for the application of RBI approaches to inspection planning as well as identifying member criticality for life extension studies.
Risk Based Inspection (RBI) is the process of developing an inspection plan based on knowledge of the risk of failure of equipment.
RBI analysis can be qualitative, quantitative or semi-quantitative.